Other Automation

01 · Industrial Automation

Other Automation

Automation items outside the listed groups, quoted from drawing.

Confirm on the quotation

  1. 01Function description
  2. 02Interface with the existing control
  3. 03Quantity per machine

How the desk quotes it

Other Automation is quoted against the part number, the interface and the quantity you need. Where the original model is discontinued, an equivalent is proposed with the difference written out — rating, mounting or contact arrangement — so it can be approved on paper before the line is produced.

Packing unit, lead time and document set are stated on the quotation. Marking and labelling follow the order note rather than a default.

Group

Industrial Automation

Sensors, controllers, drives and vision hardware that run a production line.

Protocol, I/O count and supply voltage are confirmed per model.

End of the group

Send the part number and quantity.

A photo of the nameplate or the worn part is enough to start a cross-reference. Lead time is confirmed on quotation.